A Lodgewick company - serving Enterprise, NV
A new modern detached ADU in a backyard

It Cost to Build an ADU - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
A bedroom and desk inside a converted garage
A single-story rear room addition with tall windows and a new patio
An attached garage converted into living space
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

How Much Does It Cost to Build an ADU in Enterprise, NV? The All-In Number, HOA Included

Building an ADU in Enterprise, NV runs $80,000 to $220,000 all-in once construction, Clark County fees, site work, and HOA architectural review are counted together. Attached units and garage conversions usually land under $120,000; a true detached casita typically starts around $150,000. Most Enterprise homeowners get blindsided by a step the generic quotes skip entirely: the HOA architectural review, which can add $1,500 to $4,000 in plan revisions and months of delay before the county even sees an application. Call (855) 812-7727 for a written, itemized estimate, not a ballpark.

A small deck outside a new ADU

Why the HOA Review Is the Cost Driver Nobody Quotes You

Here’s the pattern. A homeowner gets a construction bid, feels good about the number, then learns their Silverado Ranch or Mountain’s Edge HOA wants its own architectural committee to sign off. That committee often wants changes. Sometimes it wants a smaller footprint. Occasionally a CC&R clause bans the second dwelling the county would happily permit.

Every one of those changes ripples back through the plan set, and the architect has to redraw. That’s where the $1,500 to $4,000 in HOA prep comes from, and it lands before the first permit fee is even paid. The trap is that a contractor quoting only construction never mentions it. The budget resets quietly in the middle of the project.

This is the whole reason we publish the full cost stack in a single written number before work begins. HOA prep, county fees, construction, contingency. All of it in one place, so there’s no surprise line item added at permit approval or after demo starts. That written price is the core of how we run every Enterprise project.

The Full Cost Stack, Line by Line

Here’s what a realistic Enterprise ADU budget looks like broken into the four buckets that actually drive the total. Your numbers will shift with lot, unit type, and how cooperative your HOA turns out to be, but this is the honest shape of it.

Cost bucket Typical range What’s inside
HOA architectural review & possible CC&R variance $1,500-$4,000 Plan revisions to satisfy the committee, variance filing if a setback or “no second dwelling” clause conflicts
Clark County permit & review fees $2,000-$6,000 Plan check, building permits, and the county’s ADU separations and review process
Site work including caliche pre-drilling $3,000-$8,000 premium Over-excavation and pre-drilling for footings on near-rock caliche soil; grading for monsoon drainage
Construction (attached, garage conversion, or detached) $75,000-$200,000 Shell, systems, finishes; detached units sit at the top of the range

Add it up and the all-in figure lands between $80,000 and $220,000. That range is wide because the gap between a garage conversion and a detached casita is wide. The number that matters is the one specific to your lot, in writing, before construction starts.

The bathroom inside a new ADU

Attached or Detached? Your Lot Usually Decides

Most Enterprise ADU projects get pushed toward attached units and garage conversions, and it’s rarely the homeowner’s first choice. The lots drive that decision.

The late-1990s through 2010s tract homes across Silverado Ranch, Southern Highlands, and the edges of Mountain’s Edge sit on postage-stamp rear yards. Clark County requires rear-yard setbacks a detached casita has to respect. On a lot under 6,000 square feet, those setbacks often can’t be met with a detached unit at all. So the practical answer becomes a small attached unit or a garage conversion, which keeps the total under $120,000. A detached casita on the same lot would push past $150,000 and still fail setback review.

There’s an exception, and it’s worth knowing if you’re house-hunting or already live there. The 1960s-70s ranch-home pockets near the airport corridor and along the Boulder Highway/Sunrise side sit on larger lots with no HOA. Those are the Enterprise addresses where a true detached unit is routinely cost-feasible without an HOA fight. Same city, very different budget picture. If a detached unit is what you actually want, that’s where it makes financial sense.

When a detached build is the right call for your lot, we walk the full process, from setbacks to footing prep, on our New Detached ADU in Enterprise page.

The Enterprise Conditions That Change Your Construction Number

Climate and soil move the construction bucket more than most homeowners expect. Two forces are at work here.

  • Brutal Mojave heat. Sustained 105-115°F summer highs with intense sun mean an ADU here has to be designed with high-SEER mini-splits, real shade on the west and south walls, and a roof that doesn’t bake whoever lives inside. Skimp on that and you’ll pay for it every July. We spec the envelope and cooling for the climate, not for a mild-weather catalog.
  • Caliche soil. Augering for a detached unit’s footings on these near-rock lots routinely hits soil hard enough to need pre-drilling or over-excavation. That’s the $3,000 to $8,000 premium over soft-soil markets. The dry, low-rain climate simplifies drainage overall, but monsoon-season flash flooding on hard caliche still drives roof pitch, attic venting, and how the site gets graded.

Get either of those wrong and you’re back doing it right the second time. The materials matter too. We work with established brands like James Hardie siding and Abodu for prefab options, matching the build to your lot, budget, and timeline rather than forcing one system onto every project.

What the Written Price and the Guarantee Actually Cover

A written price before work starts is the whole ballgame. That’s what keeps a budget steady through permit approval, through demo, and through the finishes. The number you sign is the number you pay, and every commitment is in writing before a single nail is driven.

The 365-Day Done Right Promise is the cost-certainty side of that same commitment. If a finish or a system fails within the year after your build, we come back and fix it at no additional charge. It’s written into every project, not offered as a verbal favor. A warranty that only exists in a conversation isn’t a warranty. This one shows up on paper.

Beyond pricing, the job runs on what we call The Kingswell Way: say the price before the work, show up in the arrival window given, leave the site cleaner than we found it, put the guarantee in writing, and come back if it fails. Background-checked technicians are on every job site, so you always know who’s on your property. A live person answers the phone 24/7, so a question about your build doesn’t land in a voicemail loop.

The name fits the work. A lodge is a small house on a larger property, which is exactly what an accessory dwelling unit is. And the company belongs to the Kingswell family of home-service companies. You can start from the home page to see how all of it fits together.

Key Takeaways

  • An Enterprise ADU runs $80,000-$220,000 all-in, HOA and county fees included.
  • HOA architectural review adds $1,500-$4,000 and can stall a project before the county sees it.
  • Small HOA lots push most builds toward attached units and garage conversions under $120,000.
  • Caliche pre-drilling for footings adds a $3,000-$8,000 premium over soft-soil markets.
  • You get a fixed written price before work starts, and the 365-Day Done Right Promise in writing on every job.

FAQs

Get Your Written Enterprise ADU Price

The number you deserve is a fixed, itemized one on paper: HOA prep, county fees, site work, and construction all spelled out. Call (855) 812-7727 for a free estimate from Lodgewick ADU Builders Enterprise, and get your real all-in cost before you commit a dollar.

Written by the team at Lodgewick ADU Builders Enterprise, serving Enterprise, NV.

What Our Customers Say

★★★★★ 5.0 from 6+ reviews

"The ADU came out beautiful and the permitting, which terrified me, was handled start to finish. They kept me updated every week so I was never wondering what was happening."

- Shauna Mills

"Added a suite for my dad. They walked us through every cost before a hammer swung and stuck to it. The written price is what we paid, no change orders."

- Ingrid Salazar

"Converted our garage into a rental studio. The crew was respectful of the neighbors and kept the site clean. It's bringing in rent now and paid for itself faster than I expected."

- Grace Yoon

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with Lodgewick in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Lodgewick job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in Enterprise? Licensed & insured · free written estimates
Call (855) 812-7727

Request a Free Estimate

Tell us what's going on in Enterprise. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch