A Lodgewick company - serving Enterprise, NV
A designer reviewing ADU plans and a model with homeowners

ADU Permit Cost in Enterprise - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A compact kitchen inside a new ADU
A kitchenette inside a converted garage
A second-story addition that matches the existing roofline
A new modern ADU with wood cladding
A new bathroom inside a converted garage
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Permit Cost in Enterprise, NV: What the County Actually Charges

An ADU permit in Enterprise typically runs $2,700-$7,700 in county fees alone, and that figure doesn’t touch HOA review, plan revisions, or the cost of the build itself. Because Enterprise is unincorporated Clark County, your permit moves through a two-step process – zoning clearance first, building permit second – and plan check is currently taking 60-120 days. Call (855) 812-7727 for a written estimate that includes every permit and HOA fee before anyone picks up a hammer.

Enterprise isn’t inside Las Vegas city limits or Henderson. That single fact reshapes the whole permitting picture, and it’s the part most homeowners learn too late.

A project lead going over permit drawings with a homeowner

Why Enterprise ADU Permits Cost More Than You’d Guess

The city-permit math you may have heard from a friend in Summerlin doesn’t apply here. Enterprise sits on unincorporated Clark County land, so your ADU is reviewed under county land-use rules, not City of Las Vegas or Henderson ordinances. The county does it in two passes: zoning/land-use clearance confirms your lot, setbacks, and lot coverage allow an ADU at all, then the building permit covers the actual structure, MEP, and inspections. Each pass carries its own fee.

Homeowners also underestimate the timeline. A city permit that might clear in 30 days can stretch well past 90 in unincorporated Enterprise once county plan check and HOA review stack up. We disclose that window in writing upfront – the arrival window for your build depends on the county’s clock, not ours, and you deserve to know that before you commit.

What each fee covers

  • Zoning/land-use clearance ($400-$900): Confirms your lot in Enterprise subdivisions like Silverado Ranch or the Mountains Edge edges can legally hold an ADU under county rules – setbacks, lot coverage, height.
  • Plan check fee, scaled to project valuation ($1,200-$3,500): The county’s review of your architectural and structural drawings. A larger detached unit costs more to check than a garage conversion.
  • Building permit issuance ($800-$2,500): The actual permit to build, priced against the declared valuation of the project.
  • Inspection fees ($300-$800): County inspectors verifying foundation, framing, electrical, plumbing, and final.

Clark County ADU Permit Cost Breakdown for Enterprise

Here’s the line-item structure we build into every written price. No surprises tacked on after the county tells us what it charges.

Permit Item Typical Range
Zoning / land-use clearance $400-$900
Plan check fee (scaled to valuation) $1,200-$3,500
Building permit issuance $800-$2,500
Inspection fees $300-$800
County fees subtotal $2,700-$7,700
HOA architectural review (if applicable) $150-$600
HOA-driven plan revisions $500-$2,000

The range is wide because it should be. A single-story garage conversion on a tight Silverado Ranch lot carries far different fees than a detached casita on one of the older, larger ranch lots near the Boulder Highway and Sunrise corridor. Fees scale with the scope you’re actually building.

ADU plans, samples and a small model on a desk

The HOA Layer Nobody Warns You About

Nearly every detached ADU project in Enterprise starts in the same place: an HOA package, not a county submittal. The late-1990s through 2010s master-planned subdivisions that define this community – stucco-on-frame tract homes with tile roofs and block walls – sit under CC&Rs that often restrict detached dwellings, cap second stories, or dictate setbacks tighter than the county’s. Before a single drawing goes to Clark County, you have to submit your architectural package to the HOA’s architectural review committee.

That means two bureaucracies back to back. The HOA reviews first, and its feedback can force plan revisions that cost $500-$2,000 before the county even opens your file. Add its review fee ($150-$600) and you’ve layered real money onto the county subtotal. We’ve watched homeowners in these subdivisions discover their CC&Rs override what the county will happily permit – the county might allow the ADU, but the HOA can still say no to the second story or the detached footprint.

We handle all of it as part of the project. County submissions, HOA architectural packages, revision cycles – you deal with one point of contact, not two separate approval processes. Our technicians have up to 16 years of experience reading both sets of rules, and the ADU Design & Permitting in Enterprise service covers the drawing and submittal work that feeds both reviews.

What to Look For in an Enterprise ADU Permit Quote

When you compare quotes, compare the fee line, not just the build price. A contractor who writes “permit fees TBD” is handing you an open-ended invoice. Here’s what a straight quote looks like:

  • Permit fees stated as a range, in writing, before work starts. You shouldn’t get a surprise change order when the county’s number lands.
  • HOA submission costs included, not excluded. Ask directly.
  • The review timeline disclosed honestly. If someone promises a 30-day county approval in unincorporated Enterprise, that’s a red flag – plan check is running 60-120 days.
  • A written guarantee on the work. Every Lodgewick project carries the 365-Day Done Right Promise: if it’s not done right, we come back and make it right, at no charge, within the guarantee period.

A note on the build itself: Enterprise’s brutal Mojave summers – sustained 105-115°F stretches – mean your ADU needs high-SEER mini-splits, real shade on west and south walls, and a roof and attic venting that don’t bake the occupant. And on the caliche-hard soils throughout this area, augering for a detached unit’s footings often hits near-rock ground that needs pre-drilling. Those are build costs, not permit fees, but they show up in the same written price.

Frequently Asked Questions

What Our Customers Say

★★★★★ 5.0 from 6+ reviews

"The ADU came out beautiful and the permitting, which terrified me, was handled start to finish. They kept me updated every week so I was never wondering what was happening."

- Shauna Mills

"Added a suite for my dad. They walked us through every cost before a hammer swung and stuck to it. The written price is what we paid, no change orders."

- Ingrid Salazar

"Converted our garage into a rental studio. The crew was respectful of the neighbors and kept the site clean. It's bringing in rent now and paid for itself faster than I expected."

- Grace Yoon

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A single-story rear room addition with tall windows and a new patioA new two-story ADU over a garageAn attached garage converted into living spaceA new sunroom addition with three walls of windowsA former garage converted into a guest houseA second-story addition with a balcony, matched to the original house

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with Lodgewick in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Lodgewick job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in Enterprise? Licensed & insured · free written estimates
Call (855) 812-7727

Request a Free Estimate

Tell us what's going on in Enterprise. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch