Junior ADU & Interior Conversion Cost in Enterprise - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A new sunroom addition with three walls of windows
A kitchenette inside a converted garage
A second-story addition that matches the existing roofline
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

How Much Does a Junior ADU & Interior Conversion Cost in Enterprise?

A junior ADU and interior conversion in Enterprise typically costs $78,000 to $185,000 in 2026, depending on whether you’re converting an existing garage or spare room versus building a small attached unit from the ground up. A straightforward garage conversion with a kitchenette and full bath lands in the $78,000 – $110,000 range in most Enterprise neighborhoods. A fully permitted attached JADU with new foundation, plumbing, and electrical rough-in runs $130,000 – $185,000.

Those numbers are real, written ranges for the Enterprise market, not a vague “it depends” that forces you to call just to get a ballpark. Below we break down what each line item actually costs and what pushes a project toward the top or bottom of that band.

Key Takeaways

  • Most Enterprise JADU and interior conversion projects land between $78,000 and $185,000 in 2026.
  • Garage conversions are the cheapest path at $78,000 – $110,000; attached new-build JADUs cost the most.
  • Permit fees, utility trenching, and structural upgrades are the three line items that move a quote the most.
  • Every Lodgewick project starts with a written price before work begins, and the 365-Day Done Right Promise is in writing on every job.
  • Most Enterprise JADUs take 5 to 9 months from written price to certificate of occupancy.
A new modern ADU with wood cladding

Junior ADU & Interior Conversion Cost Breakdown (2026)

Here’s how the money breaks down for a typical Enterprise project. The ranges below reflect a mid-size JADU conversion of roughly 400 to 500 square feet – the size most Enterprise lots comfortably support.

Line Item Typical Enterprise Range What It Covers
Design & permit prep $3,500 – $8,000 Drafting, structural calcs, Clark County permit submittal
City & county permit fees $2,800 – $6,500 Building, electrical, plumbing, mechanical, school impact fees
Demolition & site prep $2,000 – $5,500 Tear-out, hauling, grading, pad leveling
Foundation / slab (new-build) $8,000 – $16,000 Engineered slab or stem-wall foundation
Framing & structural $9,000 – $22,000 Wall framing, headers, roof tie-in, shear panels
Electrical $5,500 – $12,000 Sub-panel, dedicated circuits, outlets, lighting, exterior
Plumbing $6,000 – $14,000 Supply tie-in, drain lines, bathroom rough-in, water heater
HVAC $4,000 – $9,500 Mini-split or ducted system sized for the unit
Insulation & drywall $3,500 – $8,000 R-value upgrades for desert heat, drywall, texture
Kitchenette $6,000 – $14,000 Cabinetry, sink, counters, wiring for fridge and range
Bathroom finish $5,500 – $11,000 Tile, shower or tub, vanity, fixtures
Flooring & paint $3,000 – $7,000 Luxury vinyl, tile, interior and exterior paint
Exterior, roof & siding $7,000 – $18,000 James Hardie siding, roofing tie-in, windows, doors
Final inspections & closeout $800 – $2,000 Inspections, corrections, certificate of occupancy

All-in typical ranges:

  • Garage conversion (existing structure): $78,000 – $110,000
  • Interior conversion (spare room or attached add-on): $85,000 – $125,000
  • New-build attached JADU: $130,000 – $185,000

What pushes a project toward the top of the band? Utility trenching across a long driveway, a septic or sewer line that needs re-routing, an older garage that fails a structural inspection, and extra fire separation between the JADU and the main house. What pulls it toward the bottom? Reusing an existing slab and framing, keeping the bathroom compact and stacked against existing plumbing, and choosing a prefab shell from a manufacturer like Abodu or Cover over full custom framing.

What Affects Junior ADU & Interior Conversion Pricing in Enterprise

Enterprise is a specific market. What drives cost here doesn’t look the same as it does in Henderson or North Las Vegas, and it definitely doesn’t look like coastal California. Here’s what actually moves the number.

  • Clark County permit and impact fees. Enterprise sits inside Clark County’s unincorporated area, and the fee schedule for a JADU in 92630 codes to building permits, electrical, plumbing, mechanical, and a school impact fee. The combined total runs $2,800 – $6,500 depending on the unit’s square footage and whether it shares a wall with the main house.
  • Desert heat and the cooling load. Enterprise summers regularly push past 110°F. A JADU built without adequate insulation, a properly sized mini-split, and reflective roofing will cost more to cool than the main house. A lot of our clients add $2,000 – $4,000 to the budget to get the envelope right, and they save far more than that over the unit’s life.
  • Lot configuration and setbacks. Enterprise lots vary widely – some neighborhoods off Silverado Ranch Boulevard have deep backyards with plenty of room, while older pockets near Mountain’s Edge have tight side yards that limit where you can place an attached unit. Tighter setbacks often push a project into new-build JADU territory, which adds $30,000 – $50,000.
  • Garage condition. An existing garage conversion only pencils out if the slab, framing, and roof are sound. On homes built in the 1990s and early 2000s – which describes much of Enterprise – we sometimes find slab movement or unpermitted past modifications that need correction before the conversion begins. Budget $3,000 – $8,000 for correction if the home is older than 20 years.
  • Utility tie-in distance. The farther the JADU sits from the main house’s electrical panel and water heater, the more trenching and pipe you pay for. A unit 15 feet from the house costs far less to connect than one 40 feet back.
  • Finish level. A rental-grade finish (luxury vinyl, standard cabinets, builder fixtures) lands at the low end. A family-use or multigenerational finish with upgraded tile, custom cabinetry, and designer lighting adds $15,000 – $30,000.

These are the factors we walk through with every homeowner before a written price is issued. If you want to see how our team approaches this on a project-by-project basis, our Junior ADU & Interior Conversion in Enterprise service page covers the process from first walkthrough to final inspection.

A compact kitchen inside a new ADU

Garage Conversion vs. New-Build JADU: Which Costs Less?

For the vast majority of Enterprise homeowners, a garage conversion costs 30 to 45 percent less than a new-build attached JADU. That’s because the garage already has a slab, a roof, and walls – you’re converting an existing structure rather than building one. The savings range from roughly $45,000 to $75,000 depending on square footage.

The catch: garage conversions only pencil out when the existing structure is sound. On Enterprise homes from the 1990s, we typically find that the garage is in good shape but needs a few upgrades – additional insulation, fire separation between the new unit and the main house, and a new door where the garage door used to be. Those add $6,000 – $12,000 to the base conversion cost and are already included in our $78,000 – $110,000 range.

When a new-build JADU makes more sense

  • Your garage is used for parking and storage you can’t lose.
  • The lot has a good side yard or back corner where an attached unit fits cleanly.
  • You want a fully code-new structure with a warranty on the shell.
  • You’re considering a prefab unit from a manufacturer like Mighty Buildings, Dvele, or Plant Prefab – those arrive with a factory seal and often shorten the construction window by weeks.

How Long Does a Junior ADU & Interior Conversion Take in Enterprise?

An Enterprise JADU conversion typically takes 5 to 9 months from signed written price to certificate of occupancy. Garage conversions sit closer to the 5-month end; new-build attached JADUs stretch to 8 or 9 months because of foundation work and longer permit review.

The breakdown looks like this:

  • Design and permit prep: 4 – 8 weeks
  • Clark County plan review: 3 – 6 weeks (varies by workload)
  • Construction: 12 – 20 weeks
  • Final inspection and closeout: 1 – 2 weeks

Permit review is the wildcard. Clark County’s plan review timeline has tightened in recent years, but some submittals still sit for longer than expected. We tell every homeowner the same thing: the earlier you lock in a written price, the earlier you can submit to the county, and the earlier you’ll have a finished unit.

How to Save on Junior ADU & Interior Conversion

There’s no magic discount, but there are honest ways to keep the number at the low end of the range without cutting corners you’ll regret later.

  • Reuse the existing slab and framing. A garage conversion that keeps the original slab and walls saves $12,000 – $20,000 versus a new-build. Just confirm the structure is sound first.
  • Stack the bathroom against existing plumbing. Keeping the new bathroom on the same wall as the main house’s wet wall shrinks plumbing runs and saves $2,000 – $4,000.
  • Choose rental-grade finishes if the unit is going to a tenant. Luxury vinyl planks and standard cabinets look good and last. Custom tile and engineered stone add $8,000 – $15,000 without renting for more.
  • Size it right. A 400-square-foot JADU costs far less than a 500-square-foot one and often rents for only $100 – $200 less per month. The ROI math usually favors the smaller unit.
  • Bundle utility work. If you were already planning to upgrade the main panel, do it during the JADU build rather than afterward – running the trench twice costs thousands more.
  • Get a written price before you sign. Every Lodgewick project starts with a written price before work begins – not an estimate that flexes, not a “we’ll see” number at the door. That’s the single biggest way to keep a project on budget.

Call (855) 812-7727 for a free estimate. A live person answers every call, 24/7, and we’ll walk you through the range that fits your lot and your plans.

Financing and Permit Considerations for Enterprise JADUs

Two things often catch Enterprise homeowners by surprise on their first JADU project: financing and permit sequencing. Getting both right up front saves real money.

Financing a JADU in Enterprise

Most Enterprise JADU projects are funded through a home equity line of credit, a cash-out refinance, or a construction loan. For a $90,000 garage conversion, a HELOC at current rates typically runs $600 – $900 per month on an interest-only draw, and most homeowners cover that with rent from the finished unit. Worth talking to a lender before you commit to a scope – it’s the difference between a $78,000 project you can comfortably finance and a $150,000 one that stretches you.

Permit sequencing for Clark County

JADU projects in Enterprise go through Clark County’s building department, not the City of Las Vegas, because Enterprise sits in the unincorporated county. That matters for two reasons: the fee schedule is different, and the review timeline is different. A few things to know:

  • Pre-application meeting: For any JADU over 400 square feet or any project touching an existing garage, Clark County recommends a pre-application meeting. It costs nothing and often catches problems before you pay for full plan review.
  • Fire separation: A JADU sharing a wall with the main house requires fire-rated construction between the two. That’s included in our new-build and attached-conversion pricing.
  • Owner-occupancy: JADUs in Nevada generally require the property owner to live on-site. If you’re planning to rent both the main house and the JADU, that’s typically a different category (ADU), and the rules differ. Worth confirming before design starts.
  • Parking: A standard JADU may or may not require an additional parking space, depending on the lot and the neighborhood. Enterprise lots near established neighborhoods sometimes qualify for a reduction.

Why Enterprise Homeowners Choose Lodgewick for JADU Projects

A lodge is a small house on a larger property – which is exactly what an ADU is. That name isn’t decoration; it’s the whole idea behind what we build.

Every Lodgewick project runs on The Kingswell Way: say the price before the work, show up in the window we gave you, leave the place cleaner than we found it, put the guarantee in writing, and come back if anything fails. That guarantee is the 365-Day Done Right Promise – if the work isn’t right, we come back and make it right, and that commitment is in writing on every project before work begins.

Our technicians have up to 16 years of experience working with the leading ADU brands and materials, including Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie. We match the right system to your lot, your budget, and your timeline instead of pushing whatever we happen to have on hand. Background-checked, uniformed technicians show up on every job site, so you always know who is on your property. And a live person answers every call, 24 hours a day, 7 days a week – not a voicemail loop, not a chatbot.

Each Lodgewick location is independently owned and operated, so the Enterprise team you work with is accountable to Enterprise homeowners, on the ground, on the day.

FAQs – Junior ADU & Interior Conversion Cost in Enterprise

How much does a junior ADU cost in Enterprise, NV?

A junior ADU in Enterprise typically costs $78,000 to $185,000 in 2026. A garage conversion lands at the low end of that range ($78,000 – $110,000), while a new-build attached JADU runs $130,000 – $185,000. Call (855) 812-7727 for a written price specific to your lot – estimates are free.

Is a garage conversion cheaper than a new-build JADU in Enterprise?

Yes – by $45,000 to $75,000 on average. A garage conversion in Enterprise runs $78,000 – $110,000 versus $130,000 – $185,000 for a new-build attached JADU. The savings come from reusing the existing slab, walls, and roof. Call (855) 812-7727 and we’ll tell you which path makes more sense for your property.

What permits do I need for a JADU in Enterprise, NV?

You need a Clark County building permit covering structural, electrical, plumbing, and mechanical work, plus a school impact fee. Combined permit costs typically run $2,800 – $6,500 for a standard JADU. Enterprise sits in unincorporated Clark County, so the county handles plan review, not the City of Las Vegas. Call (855) 812-7727 with your address and we’ll confirm the specific requirements for your lot.

Can I convert my garage into a JADU in Enterprise?

Usually, yes – but only if the existing slab, framing, and roof pass inspection, and the property meets Clark County’s owner-occupancy and setback rules. On Enterprise homes built in the 1990s and early 2000s, we typically find the garage is structurally sound but needs fire separation, insulation upgrades, and a new exterior door where the garage door was. Budget $6,000 – $12,000 on top of the base $78,000 – $110,000 conversion range for those upgrades. Call (855) 812-7727 to schedule a walkthrough.

How long does a JADU take from start to finish in Enterprise?

A JADU in Enterprise takes 5 to 9 months from signed written price to certificate of occupancy. Garage conversions finish near 5 months; new-build attached JADUs take 8 or 9 because of foundation work and longer plan review. Clark County plan review alone typically takes 3 to 6 weeks. Call (855) 812-7727 to get your project on the schedule and start the permit clock.

Start With a Written Price, Not a Guess

You shouldn’t have to call to find out whether a junior ADU is even in reach. And you shouldn’t have to sign a contract with the price still up in the air. Every Lodgewick project starts with a free estimate and a written price before any work begins, backed by the 365-Day Done Right Promise on every project we touch.

If you’re thinking about a JADU, garage conversion, or interior conversion in Enterprise, we’d be glad to walk your property, talk through the range, and put a real number in writing. Visit our home page for a full view of what we build, or call (855) 812-7727 today. A live person answers 24/7, and the estimate is free.

Pricing reflects the Enterprise market as of 2026. Lodgewick ADU Builders Enterprise offers free estimates – call (855) 812-7727.

What Our Customers Say

★★★★★ 5.0 from 6+ reviews

"The ADU came out beautiful and the permitting, which terrified me, was handled start to finish. They kept me updated every week so I was never wondering what was happening."

- Shauna Mills

"Added a suite for my dad. They walked us through every cost before a hammer swung and stuck to it. The written price is what we paid, no change orders."

- Ingrid Salazar

"Converted our garage into a rental studio. The crew was respectful of the neighbors and kept the site clean. It's bringing in rent now and paid for itself faster than I expected."

- Grace Yoon

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with Lodgewick in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Lodgewick job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in Enterprise? Licensed & insured · free written estimates
Call (855) 812-7727

Request a Free Estimate

Tell us what's going on in Enterprise. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch